{"id":9241,"date":"2026-02-02T09:17:59","date_gmt":"2026-02-02T09:17:59","guid":{"rendered":"https:\/\/www.ebazagardens.com\/?post_type=glc_project&#038;p=9241"},"modified":"2026-02-02T09:17:59","modified_gmt":"2026-02-02T09:17:59","slug":"sceco-dammam-public-playground-installation","status":"publish","type":"glc_project","link":"https:\/\/www.ebazagardens.com\/en\/project\/sceco-dammam-public-playground-installation","title":{"rendered":"SCECO Dammam Playground"},"content":{"rendered":"<h2 data-start=\"1310\" data-end=\"1360\">SCECO Dammam Playground \u2013 16 Safe Outdoor Features<\/h2>\n<p data-start=\"1728\" data-end=\"2129\"><strong data-start=\"1728\" data-end=\"1768\">SCECO Dammam playground installation<\/strong> was successfully completed as a full public outdoor recreation project designed to serve families, children, and the surrounding community. Executed in coordination with <strong data-start=\"1939\" data-end=\"1975\">Mani Contracting Company (E.L.T)<\/strong>, this project represents a complete supply, delivery, and installation of a modern children\u2019s outdoor playground system within the SCECO Dammam facility.<\/p>\n<p data-start=\"2131\" data-end=\"2516\">The SCECO Dammam playground project was developed with the objective of creating a vibrant, safe, and multifunctional recreational environment suitable for public use. The playground supports active play, social interaction, and imaginative experiences for children of various age groups, while maintaining high standards of safety and durability required for institutional facilities.<\/p>\n<hr data-start=\"2518\" data-end=\"2521\" \/>\n<h2 data-start=\"2523\" data-end=\"2583\"><strong data-start=\"2526\" data-end=\"2583\">Project Planning &amp; Design for SCECO Dammam Playground<\/strong><\/h2>\n<p data-start=\"2585\" data-end=\"2904\">The planning phase of the SCECO playground installation in Dammam involved detailed coordination between the client, Mani Contracting Company, and the technical team from Ebaza Gardens. Site conditions, available space, circulation paths, and user safety were carefully assessed before finalizing the playground layout.<\/p>\n<p data-start=\"2906\" data-end=\"3141\">The design focused on creating multiple play zones that allow group activities without congestion. Equipment spacing, fall zones, and movement flow were optimized to ensure children can move freely and safely throughout the playground.<\/p>\n<p data-start=\"3143\" data-end=\"3365\">Visual appeal was also a key consideration. Bright colors, themed elements, and playful forms were selected to make the playground attractive and inviting while blending harmoniously with the surrounding urban environment.<\/p>\n<hr data-start=\"3367\" data-end=\"3370\" \/>\n<h2 data-start=\"3372\" data-end=\"3425\"><strong data-start=\"3375\" data-end=\"3425\">Playground Equipment Installed at SCECO Dammam<\/strong><\/h2>\n<p data-start=\"3427\" data-end=\"3598\">The SCECO Dammam playground installation includes a comprehensive range of outdoor play equipment designed to support physical development, creativity, and inclusive play.<\/p>\n<h3 data-start=\"3600\" data-end=\"3640\"><strong data-start=\"3604\" data-end=\"3640\">Multi-Play Playground Structures<\/strong><\/h3>\n<p data-start=\"3642\" data-end=\"3876\">The centerpiece of the playground is a large multi-play unit featuring elevated platforms connected through interactive panels and access points. These structures encourage climbing, coordination, and imaginative role-play activities.<\/p>\n<p data-start=\"3878\" data-end=\"4088\">The multi-play system is designed for group use, allowing multiple children to play simultaneously without interference. Decorative roof elements and themed panels enhance the visual identity of the playground.<\/p>\n<h3 data-start=\"4090\" data-end=\"4120\"><strong data-start=\"4094\" data-end=\"4120\">Slides &amp; Tunnel Slides<\/strong><\/h3>\n<p data-start=\"4122\" data-end=\"4373\">A combination of straight slides, curved slides, and tunnel slides were installed to provide varied play experiences. These slides are manufactured from high-quality <strong data-start=\"4288\" data-end=\"4305\">LLDPE plastic<\/strong>, offering smooth surfaces, UV resistance, and long-term durability.<\/p>\n<p data-start=\"4375\" data-end=\"4469\">The tunnel slides add excitement and exploration while maintaining safe entry and exit points.<\/p>\n<h3 data-start=\"4471\" data-end=\"4509\"><strong data-start=\"4475\" data-end=\"4509\">Swings &amp; Motion Play Equipment<\/strong><\/h3>\n<p data-start=\"4511\" data-end=\"4746\">The playground includes swing systems designed for different age groups, supporting balance, coordination, and social interaction. Motion-based play elements help children develop body awareness and confidence through dynamic movement.<\/p>\n<h3 data-start=\"4748\" data-end=\"4785\"><strong data-start=\"4752\" data-end=\"4785\">Seesaws &amp; Group Play Elements<\/strong><\/h3>\n<p data-start=\"4787\" data-end=\"4961\">Group seesaws and interactive play equipment were installed to promote cooperative play. These elements encourage teamwork, communication, and shared activity among children.<\/p>\n<hr data-start=\"4963\" data-end=\"4966\" \/>\n<h2 data-start=\"4968\" data-end=\"5008\"><strong data-start=\"4971\" data-end=\"5008\">EPDM Safety Flooring Installation<\/strong><\/h2>\n<p data-start=\"5010\" data-end=\"5269\">As part of the SCECO Dammam playground project, <strong data-start=\"5058\" data-end=\"5089\">EPDM rubber safety flooring<\/strong> was installed across the entire play area. This flooring provides excellent shock absorption, slip resistance, and durability, making it ideal for high-traffic public playgrounds.<\/p>\n<p data-start=\"5271\" data-end=\"5445\">The EPDM surface was applied in multiple colors to define play zones and enhance visual appeal. The flooring also contributes to improved accessibility and comfort for users.<\/p>\n<p data-start=\"5447\" data-end=\"5575\">Proper ground preparation and leveling were completed before flooring installation to ensure long-term performance and drainage.<\/p>\n<hr data-start=\"5577\" data-end=\"5580\" \/>\n<h2 data-start=\"5582\" data-end=\"5621\"><strong data-start=\"5585\" data-end=\"5621\">Materials &amp; Construction Quality<\/strong><\/h2>\n<p data-start=\"5623\" data-end=\"5761\">All equipment and materials used in the SCECO Dammam playground installation were selected to meet institutional and public-use standards.<\/p>\n<ul data-start=\"5763\" data-end=\"6010\">\n<li data-start=\"5763\" data-end=\"5839\">\n<p data-start=\"5765\" data-end=\"5839\"><strong data-start=\"5765\" data-end=\"5786\">Steel Components:<\/strong> Hot-dip galvanized steel with powder-coated finish<\/p>\n<\/li>\n<li data-start=\"5840\" data-end=\"5894\">\n<p data-start=\"5842\" data-end=\"5894\"><strong data-start=\"5842\" data-end=\"5865\">Plastic Components:<\/strong> UV-resistant LLDPE plastic<\/p>\n<\/li>\n<li data-start=\"5895\" data-end=\"5942\">\n<p data-start=\"5897\" data-end=\"5942\"><strong data-start=\"5897\" data-end=\"5910\">Flooring:<\/strong> Premium EPDM rubber surfacing<\/p>\n<\/li>\n<li data-start=\"5943\" data-end=\"6010\">\n<p data-start=\"5945\" data-end=\"6010\"><strong data-start=\"5945\" data-end=\"5959\">Fasteners:<\/strong> Anti-corrosion hardware for outdoor environments<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"6012\" data-end=\"6127\">These materials ensure resistance to weather, heat, and continuous use while maintaining safety and visual quality.<\/p>\n<hr data-start=\"6129\" data-end=\"6132\" \/>\n<h2 data-start=\"6134\" data-end=\"6172\"><strong data-start=\"6137\" data-end=\"6172\">Installation Process &amp; Timeline<\/strong><\/h2>\n<p data-start=\"6174\" data-end=\"6361\">The supply, delivery, and installation of the SCECO Dammam playground were completed within the planned <strong data-start=\"6278\" data-end=\"6301\">eight-week timeline<\/strong>. The installation process was managed in structured phases:<\/p>\n<ol data-start=\"6363\" data-end=\"6562\">\n<li data-start=\"6363\" data-end=\"6399\">\n<p data-start=\"6366\" data-end=\"6399\">Site preparation and base works<\/p>\n<\/li>\n<li data-start=\"6400\" data-end=\"6443\">\n<p data-start=\"6403\" data-end=\"6443\">Installation of playground foundations<\/p>\n<\/li>\n<li data-start=\"6444\" data-end=\"6490\">\n<p data-start=\"6447\" data-end=\"6490\">Assembly of play structures and equipment<\/p>\n<\/li>\n<li data-start=\"6491\" data-end=\"6521\">\n<p data-start=\"6494\" data-end=\"6521\">EPDM flooring application<\/p>\n<\/li>\n<li data-start=\"6522\" data-end=\"6562\">\n<p data-start=\"6525\" data-end=\"6562\">Final inspection and quality checks<\/p>\n<\/li>\n<\/ol>\n<p data-start=\"6564\" data-end=\"6679\">All equipment was securely anchored and tested for stability, spacing, and safety compliance before final handover.<\/p>\n<hr data-start=\"6681\" data-end=\"6684\" \/>\n<h2 data-start=\"6686\" data-end=\"6736\"><strong data-start=\"6689\" data-end=\"6736\">Community &amp; Functional Value of the Project<\/strong><\/h2>\n<p data-start=\"6738\" data-end=\"6992\">The completed SCECO Dammam playground provides a valuable recreational space for children and families within the community. The playground supports physical activity, social engagement, and creative play, contributing positively to community well-being.<\/p>\n<p data-start=\"6994\" data-end=\"7158\">By providing a safe and attractive outdoor play area, the project enhances the overall usability of the SCECO facility and supports healthy lifestyles for children.<\/p>\n<hr data-start=\"7160\" data-end=\"7163\" \/>\n<h2 data-start=\"7165\" data-end=\"7225\"><strong data-start=\"7168\" data-end=\"7225\">Ebaza Gardens Expertise in Public Playground Projects<\/strong><\/h2>\n<p data-start=\"7227\" data-end=\"7576\">Ebaza Gardens continues to deliver large-scale public and institutional playground projects across Saudi Arabia. The successful execution of the SCECO Dammam playground demonstrates the company\u2019s capability in handling complex public installations, coordinating with contracting partners, and delivering durable, high-quality outdoor play solutions.<\/p>\n<p data-start=\"7578\" data-end=\"7700\">This project further strengthens Ebaza Gardens\u2019 portfolio of public, utility-based, and community playground developments.<\/p>\n","protected":false},"featured_media":9242,"template":"","project_category":[2737],"class_list":["post-9241","glc_project","type-glc_project","status-publish","has-post-thumbnail","hentry","project_category-public-parks-and-gardens"],"_links":{"self":[{"href":"https:\/\/www.ebazagardens.com\/en\/wp-json\/wp\/v2\/glc_project\/9241","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ebazagardens.com\/en\/wp-json\/wp\/v2\/glc_project"}],"about":[{"href":"https:\/\/www.ebazagardens.com\/en\/wp-json\/wp\/v2\/types\/glc_project"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ebazagardens.com\/en\/wp-json\/wp\/v2\/media\/9242"}],"wp:attachment":[{"href":"https:\/\/www.ebazagardens.com\/en\/wp-json\/wp\/v2\/media?parent=9241"}],"wp:term":[{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/www.ebazagardens.com\/en\/wp-json\/wp\/v2\/project_category?post=9241"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}